Pipeline

 

TransCanada
Energy East Pipeline Project


Date: 2013 - Ongoing Description: 4600 km (42 in) pan-Canadian crude oil pipeline that will transport crude oil from Alberta to New Brunswick.

Services offered :

  • Preliminary engineering (FEED) as sub consultant to Stantec for a 800 km new-built section in Ontario and Québec
  • Pre-detailed engineering
  • Locations and supervision of geotechnical drillings

Valero
Pipeline Saint-Laurent

 

Date: 2005 - 2012 Description: 242 km (16 in.) gasoline pipeline between Montreal-East and Lévis.

 

Services offered :

  • Feasibility study and geotechnical studies
  • Preliminary and detailed engineering
  • Tender documents
  • Construction inspection

Gaz Métro
Gazoduc Bécancour

Date: 2003 - 2005 Description: Longest river crossing by directional drilling (2.27 km) between Trois-Rivières and Bécancour for a 18 km (20 in.) gas pipeline. Johnston-Vermette won 2 Léonards (Vision and Énergie) from the AICQ for this project in 2007.

Services offered :

  • Feasibility study
  • Geotechnical studies
  • Preliminary and detailed engineering
  • Construction supervision

New Millennium Iron
KéMag Slurry Pipeline Project


Date: 2011 Description: 650 km slurry pipeline between Schefferville and Sept-Îles.
 

Services offered :

  • Route selection
  • Cost estimates for various scenarios

Photos

Saint-Laurent Pipeline Saint-Laurent Pipeline KéMag Ferroduct Becancour Pipeline : Saint Lawrence Crossing Becancour Gas Pipeline Montreal-Portland Pipeline Gas pipeline from Montreal to New Hampshire St. Lawrence River Crossings at Montreal Oil pipeline between Montreal and Toronto Biogas Treatment and Compression Compressed Natural Gas: Compression and Drying




Johnston-Vermette

6110, rue Christophe-Pélissier
Trois-Rivières, Qc G9A 5C9

Phone: 819-373-3550
Fax: 819-373-6794